If code permits, lead sleeve anchors, or Tapcon style concrete lags can also be driven into the exposed basement wall in place of the through bolts. To fasten a deck ledger to an exposed basement wall, use the same “through bolt” procedure as described for brick veneer above. Cut pieces of PT 4x4 post to fit from the top of the double ledger support to the bottom of the deck ledger above.Drill two lengths of ledger board for anchors as described above and anchor them both to the solid concrete, stacked to provide a 3” wide ledge along the top edge.When fastening to uneven stone, or stucco, the ledger board must be supported from beneath with a ledger attached to the solid concrete foundation at the bottom of the wall. To fasten to solid concrete, follow the instructions for brick veneer and substitute a sleeve anchor, or other appropriate concrete anchor. Tack a shim strip in place to hold the ledger board level. When fastening to siding follow the same steps as above. Use a socket wrench or impact driver to drive the bolts into the frame until the ledger is snug against the wall.Reposition the ledger board and fit a ½” lag bolt, 10” long into each hole and drive them in slightly with a hammer.Drill through the brick veneer with a ½ inch masonry bit in a hammer drill, until you reach the wood frame behind.To attach a ledger against a wall through brick veneer: Follow the instructions above, substituting the appropriate anchors. Anchors should be installed at staggered heights in between joists. This give it a good foundation, and helps to make it sturdy.
![do i need ledger board deck do i need ledger board deck](https://www.decks.com/media/sltmtb0u/16011418480444.jpg)
Add base layer of concrete to the bottom of the tube and then set your post in. Cement should be the consistency of cake batter when ready to pour. With your tubes in place, you need to mix and add your cement. Floor trusses do not use a typical band (rim) joist around the edge of the floor, where ledgers are typically attached. Now we’ll show you how to install deck posts. Fasten in place with nuts and a socket wrench.Ī 2X8 ledger is fastened to the concrete foundation wall using ½”X4” sleeve anchors, or other concrete anchors. The resulting, engineered product is a long-spanning floor joist - about a half to two times taller than a typical 2x10 - that is able to house HVAC ducts, plumbing and other service lines within the floor assembly. Reposition the ledger so that the “through bolts” protrude through the ledger.Drill pilot holes for lead sleeve anchors into the brick and drive a through bolt anchor into each hole.Position the ledger against the wall and mark the anchor positions through the hole onto the wall.If possible, you will want to have the ledger. The joists are 1 1/2 thick, hence the 3 reduction in length so that the finished deck will be the designated length. This 3 is so that the joists at either end of the deck will overlap the ledger and be nailed to it.
![do i need ledger board deck do i need ledger board deck](https://www.hdgep.com/uploads/6/0/9/1/60917007/s231639328815393233_p63_i87_w2048.jpeg)